Prefab & ADU Glossary

Introduction

Prefab, modular, and ADU projects come with a surprising amount of terminology—and much of it is used inconsistently. This glossary is designed to help people compare options more confidently and better understand how builders, manufacturers, and jurisdictions talk about prefab construction.

Commonly Confused Terms

Prefab vs Modular

Prefab is a broad category. Modular is one specific type of prefab construction.

ADU vs Tiny Home

An ADU is a zoning classification. A tiny home describes size and form factor.

Manufactured vs Modular

Manufactured homes follow HUD standards. Modular homes follow local building codes.

Turnkey vs Design-Build

Turnkey usually means one primary team manages most phases. Design-build may still involve multiple coordinated parties.

Prefab vs Site-Built

Prefab involves off-site fabrication. Site-built homes are constructed almost entirely on the property itself.

Barndominium

A residential structure inspired by agricultural or post-frame buildings, often featuring open layouts and simplified forms. Some are site-built while others incorporate prefab or modular systems.

Tiny Home

A very small residential structure, often under 400 square feet. Tiny homes may be built on foundations or trailers and are regulated differently depending on jurisdiction.

Mobile Home

A housing type generally referring to factory-built homes constructed before modern manufactured housing standards were introduced in 1976.

Stick-Built / Site-Built

Traditional construction where most or all work happens directly on the property rather than in a factory.

Net-Zero

A building designed to produce as much energy as it consumes over the course of a year.

Off-Grid

A property or home designed to operate independently from public utility systems.

Post-Frame Construction

A structural system using large posts or poles rather than conventional framing. Common in agricultural buildings and some barndominiums.

Value Engineering

The process of adjusting design or material selections to reduce cost while attempting to maintain functionality.

Change Order

A formal modification to the original construction agreement involving changes in cost, scope, materials, or schedule.

By-Right Approval

A permitting process where a project is automatically allowed if it meets existing zoning and code requirements.

Easement

A legal right allowing someone else to use a portion of a property for a specific purpose, such as utilities or access.

Impact Fees

Fees charged by local governments to offset infrastructure impacts from new development.

Septic System

An on-site wastewater treatment system commonly used in rural properties without municipal sewer service.

Soil Test / Geotechnical Report

An engineering analysis evaluating soil conditions, stability, drainage, and load-bearing characteristics.

Shed-to-Home Conversion

The process of converting a shed-like structure into a habitable residential space, subject to local building and zoning codes.

Smart Home Ready

A home pre-configured or designed to support integrated technology systems such as lighting, climate, security, and automation.

Where to Go Next

Start Here

Prefab vs Modular vs ADU

How to Compare Prefab Builders

0
Shares
Page Navigation